CERTIFICATION BODY FOR PRODUCTS·SK09 · NO 1480
Applications to download
Application forms for authorised body SK09 and notified body No. 1480. Send the completed application to office@vuis-cesty.sk.
NOTICE
The initial inspection or continuous surveillance procedure starts upon receipt of the application and continues with the conclusion of a certification contract.
Authorised body SK09
Application for an initial inspection of the manufacturing plant and the factory production control and for the issue of a certificate of conformity of the factory production control
Download (DOCX)Application for continuous surveillance of the factory production control and assessment and evaluation of the product control system
Download (DOCX)Application to add construction products to the certificate of conformity of the factory production control
Download (DOCX)
Notified body No. 1480
Application for an initial inspection of the manufacturing plant and the factory production control and for the issue of a certificate of conformity of the factory production control
Download (DOCX)Application for continuous surveillance of the factory production control and assessment and evaluation of the product control system
Download (DOCX)Application to add construction products to the certificate of conformity of the factory production control
Download (DOCX)
Related documents
CONTACT PERSON

Ing. Adrián Fonód, PhD.
DEPUTY DIRECTOR, HEAD OF THE AUTHORISED / NOTIFIED BODY, HEAD OF THE CERTIFICATION BODY
+421 903 241 552